• Jun 01, 2020 News!Papers published in Vol.10, No.2 have all received dois from Crossref.
  • May 15, 2020 News!Papers published in Vol.9, No.1-Vol.10, No.1 have all received dois from Crossref.
  • May 15, 2020 News!IJIEE Vol. 10, No. 2 issue has been published online!   [Click]
General Information
    • ISSN: 2010-3719 (Online)
    • Abbreviated Title: Int. J. Inf. Electron. Eng.
    • Frequency: Quarterly
    • DOI: 10.18178/IJIEE
    • Editor-in-Chief: Prof. Chandratilak De Silva Liyanage
    • Executive Editor: Jennifer Zeng
    • Abstracting/ Indexing : Google Scholar, Electronic Journals Library, Crossref and ProQuest,  INSPEC (IET), EBSCO, CNKI.
    • E-mail ijiee@ejournal.net
Editor-in-chief

 
University of Brunei Darussalam, Brunei Darussalam   
" It is a great honor to serve as the editor-in-chief of IJIEE. I'll work together with the editorial team. Hopefully, The value of IJIEE will be well recognized among the readers in the related field."

IJIEE 2014 Vol.4(2): 129-132 ISSN: 2010-3719
DOI: 10.7763/IJIEE.2014.V4.421

Research on the Risk Assessment of Urban Power Network Planning Based on Improved Risk Matrix

Jie Yao and Yu Jiang
Abstract— The urban power network planning is the premise of the power grid construction, so more and more attention has been paid to its scientific nature and rationality. However, the multifarious risks in the urban power network planning have become the barriers of the city power grid development. Hence, it is extremely important to identify these risk factors. In this paper, we proposed an improved risk matrix algorithm innovatively. Then, it was applied to assess the risk of XX city’s power network planning. In this algorithm, the conventional two-dimensional risk matrix has been reshaped by adding two more dimensional characteristics, including the risk rating and the risk’s attention rating. Based on this four-dimensional risk matrix, the Borda method is used to calculate the sequence value of each risk factor, then we can use these sequence values to construct the judgment matrix by using AHP method so as to calculate the weight of the risk factors and then identify a couple of important risk factors that have great impact on the urban power network planning. Finally, some corresponding advices of risk aversion are proposed to guarantee the smooth operation of urban power network planning.

Index Terms— Urban power network planning, risk assessment, risk matrix, borda method, AHP method.

The authors are with Northeast Dianli University, Jilin City, China (e-mail: leeyooab@ 163.com, alex6623105@qq. com).

[PDF]

Cite: Jie Yao and Yu Jiang, " Research on the Risk Assessment of Urban Power Network Planning Based on Improved Risk Matrix," International Journal of Information and Electronics Engineering vol. 4, no. 2, pp. 129-132, 2014.

Copyright © 2008-2021. International Journal of Information and Electronics Engineering. All rights reserved.
E-mail: ijiee@ejournal.net